웨비나

How to Overcome Build Prep Challenges with Controlled Nesting

By Katie Esper, Steven Ostrowski, Victor Lopez from Parker Hannifin

이 웨비나 정보

Optimized nesting with SLS or MJF helps users overcome challenges often encountered during the build prep stage by reducing costs, streamlining processes, and more. 


During this free webinar, Materialise experts join AM Engineer Victor Lopez from Parker Hannifin to discuss how having control over the nesting process with Magics’ Sinter Module enables a quick, optimized nesting solution to overcome these challenges. 

학습할 내용

  • What are the most common challenges users face during the build preparation phase
  • Why an optimized nesting process is crucial
  • How controlling the nesting process provides a quick and straightforward way to overcome these challenges
  • How Parker Hannifin benefits from the Magics’ Sinter Module 

Speakers

Victor Lopez

AM Engineer, Parker Hannifin

Katie Esper

Account Manager, Materialise

Steven Ostrowski

Application Engineer, Materialise


공유 위치:

Share on Facebook
Share on Twitter
Share on LinkedIn
Share with Pocket

추천 항목